All jobs
Oil & Gas

Barge Master / Offshore Installation Manager

Nigeria
Accepting applications Posted Closes

At a glance

Location
Nigeria
Work setting
Offshore
Rotation
6 weeks on/off
Industry
Oil & Gas
Employer
Shown after sign-in

About the role

Barge Master / Offshore Installation Manager required for a Mobile Offshore Production Unit (MOPU) platform in the Ebok field, Nigeria. The role involves working on a MOPU platform with a 6-week on/off rotation and a wage of 950 USD per working day net. Required documents include an STCW 10 package. Required certification includes Chief Engineer Unlimited. Additional required documents include BOSIET, HUET, AC EBS, UKOAA / OGUK Medical, SMS System Training, Risk Assessment Lockout Tagout, Incident Investigation & Root Cause Analysis, Enclosed Space & Portable Gas Measuring Instrument, and OVID Port State Control. Experience as a Barge Master and Offshore Installation Manager on MOPU platforms is required. English Marlins test 85% or higher is required.

Found in a public job post. Contact details and links are hidden on this page and shown to signed-in members.

Apply for this role

Sign in to see the recruiter's contact details and send a tailored application in one step. Your first month is free.

Apply with GP Solution See what is included
  • Application written from your profile and this listing
  • Matched to similar live roles automatically
  • Every application tracked in one workboard