At a glance
- Location
- Scotland
- Work setting
- Offshore
- Rotation
- 2 weeks on / 2 weeks off
- Industry
- Wind energy
- Employer
- Taylor Hopkinson
About the role
Offshore Installation Manager for a major offshore wind project in Scotland. Responsible for leading execution delivery for the Transport & Installation campaign for export cables, including load-out, transport, cable laying, burial, pull-ins, and termination/testing. The role involves coordinating offshore installation teams and contractor personnel on cable lay vessels, trenching vessels, and support craft; overseeing safe marine transport from storage/load-out ports to the offshore site; ensuring work is executed in line with the installation procedure, method statements, risk assessments, and project schedule; monitoring marine coordination, DP operations, and vessel performance; managing interface and sequencing with other offshore scopes; enforcing HSE standards; driving progress tracking and reporting; supporting offshore readiness reviews, W2W planning, weather window assessments, and marine operations planning; and managing offshore execution risk and mitigation measures. Experience in offshore wind farm installation and export cable T&I is required, along with offshore safety certification, OGUK/ENG1 medical, and relevant STCW or marine safety certifications. Rotational offshore schedule.
Found in a public job post. Contact details and links are hidden on this page and shown to signed-in members.
Apply for this role
Sign in to see the recruiter's contact details and send a tailored application in one step.
Apply with GP Solution See what is included- Application written from your profile and this listing
- Matched to similar live roles automatically
- Every application tracked in one workboard