At a glance
- Location
- Europe
- Work setting
- Offshore
- Rotation
- 5 weeks ON / 5 weeks OFF
- Industry
- Wind energy
- Employer
- Shown after sign-in
About the role
Main Crane Operator required for a Wind Turbine Installation Vessel (WTIV) in Europe. The role involves operating a main heavy-lift crane on a jack-up vessel, with WTIV or jack-up experience required. Proven experience handling heavy lift cranes of around 1,000 tons is needed, and wind turbine installation experience with towers, nacelles, and blades is preferred. Required certifications and documents include Crane Operator Stage 3 (Sparrows, SOMA or API), HUET CA-EBS, valid STCW documents, GWO Working at Heights, and GWO Sea Survival. Rotation is 5 weeks on / 5 weeks off, with potential long-term cooperation.
Found in a public job post. Contact details and links are hidden on this page and shown to signed-in members.
Apply for this role
Sign in to see the recruiter's contact details and send a tailored application in one step.
Apply with GP Solution See what is included- Application written from your profile and this listing
- Matched to similar live roles automatically
- Every application tracked in one workboard