At a glance
- Location
- Europe
- Work setting
- Offshore
- Rotation
- 5 weeks ON / 5 weeks OFF
- Industry
- Wind energy
- Employer
- Shown after sign-in
About the role
Experienced Main Crane Operator required for a Windfarm Installation Vessel operating in Europe. The role involves operating heavy-lift cranes around 3,000T and requires WTIV/Jack-Up experience, wind turbine installation experience, and work on towers, nacelles, and blades. Rotation is 5 weeks on / 5 weeks off, with joining on 27 October 2026. Required certificates include Crane Operator Stage 3 (Sparrows, Soma or API), HUET with CA-EBS, valid STCW documents, GWO Working at Heights, GWO Sea Survival, and Schengen Visa if required.
Found in a public job post. Contact details and links are hidden on this page and shown to signed-in members.
Apply for this role
Sign in to see the recruiter's contact details and send a tailored application in one step. Your first month is free.
Apply with GP Solution See what is included- Application written from your profile and this listing
- Matched to similar live roles automatically
- Every application tracked in one workboard